TECHNICAL CONSIDERATIONS

  • Geological framework analysis (modelling)
  • Mechanical well configuration analysis
  • Injection monitoring and optimization
  • Operational process workflow 

TASK TO DEVELOP

  • Design, monitor, and analyze injectivity tests, simulating Slurry injection.
  • Scale-process flow design.
  • Technical and commercial assistance for procurement whole slurry units, or its design and equipment, tailored to specific slurry injection wells.
  • Continuous monitoring and optimization of Slurry injector wells.
  • Continuous Technical support and quality control for the entire waste management business.
  • Analysis of historical behavior over key parameters and conditions, to establish possible influence or not on Induced seismicity, Understand location, area and act to prevent and defend your ops.